SOLUTIONS · VPP OPERATORS Preparing grid tests

Run scattered resources as one power plant

Based on the Korean virtual power plant (VPP) standard KSGA-025-19, one platform covers everything from plant data collection and control to links with KEPCO and the Korea Power Exchange.

Connection structure — from resources to KEPCO and the power exchange
Resources (an RTU per plant)SolarPV + ESSHeat-pump homesWind · V2G …Encrypted VPN · 0.2 s dataENERBOT EMSProtection · charge decisionsMonitoring · logs · alertsActualsTargetsVPP operator systemPortfolios · multiple operatorsBids · plans (day-ahead · RT)Generation forecastingTrading · settlement · SMPRecords «did we follow»KEPCO (DSO)KSGA-025-19-2 · IPSecFlexibility paymentsPower ExchangeForecast scheme · DRPublic SMPBids · meteringCurtailment ordersForecast submissionSMP · settlement⭐ Protection first — whatever the order, battery, fire and climate checks stay with the on-site EMS

Real screen — VPP dashboard

VPP dashboard
VPP dashboard
Utility link status · actuals vs. commitments · headroom · SMP · today’s sales · day-ahead and real-time bids · dispatch logic (what is setting the PCS right now)

Real ENERBOT screen (Korean UI) · development test environment with simulator values · plant names and addresses hidden

What the VPP operator system does

Organised along the functional areas defined in Part 1 of the standard (KSGA-025-19-1).

Forecasting

Forecasts tomorrow’s solar output hour by hour from KMA weather forecasts, and scores the error every day.

Bidding · planning

Builds day-ahead and real-time plans automatically from PV forecasts and ESS state of charge.

Operation

Sends each plant its targets according to the plan and utility orders — with on-site protection first.

Trading · settlement

SMP, forecast-scheme settlement and plan-vs-actual. Statement reconciliation comes with the first contract.

Grid support

Polls distribution curtailment orders every minute, follows them and records whether we did.

Where each scheme stands

SchemeWhatENERBOT
KEPCO DSO linkVPP registration · day-ahead bids · curtailment orders · metering reportsBuilt · preparing grid tests Per Part 2 of the standard (KSGA-025-19-2)
Exchange forecasting schemeDay-before forecasts at 10:00 and 17:00 · error-based settlementIn operation Forecasts, submitted values and settlement calculation · exchange submission link after the spec is issued
Exchange demand response (DR)«Use less» on instruction · «use more» when renewables are in surplus (Plus DR)Planned Fits heat pumps and customer ESS
Exchange dispatch (semi-central · RE bidding)PV and wind output follows dispatch instructionsIn development

Trading and settlement — where the money comes from

Each scheme pays differently. ENERBOT calculates by the published rules and lines up plans and actuals on the same screen.

KEPCO distribution flexibility
Metered kWh × bid price − shortfall

Checks every hour whether the bid plan was followed and records, order by order, whether we complied.

Calculation · records built
Exchange forecasting scheme
Average of 1st and 2nd error → ≤ 4 %: KRW 4 · ≤ 6 %: KRW 3

Sorts each hour into its settlement band per Appendix 2 of the Market Rules and estimates the payment.

In operation
System marginal price (SMP)
Public SMP stored every hour

Takes the next-day SMP published by the exchange for the «estimated sales» in plans and actuals.

In operation
Revenue sharing — how revenue is split between the operator and plant owners differs by contract. We follow the terms of the first contract. Planned
A day — what moves when
00h03h06h09h12h15h18h21h24h09:00–09:30 KEPCO day-ahead bid10:00 forecast #117:00 forecast #223:00 next-day SMP05:10 score yesterdayAll day: curtailment poll 1 min · metering 1 min · ops report 5 min

Times per the utility link standard (KSGA-025-19-2), Chapter 14 of the Market Rules and public SMP

Even with several operators

Each operator has its own utility codes, keys, portfolios and screens. A plant can join several schemes at once and is registered separately for each.

The on-site EMS underneath

Even when a VPP order arrives, battery, fire and climate protection is decided on site first — on the same EMS that has protected 198 plants.